Integrated Power System Plan (IPSP) Review
Under the Electricity Act, 1998, the Ontario Power Authority (OPA) is responsible for developing both an integrated power system plan (IPSP) and appropriate procurement processes for managing electricity supply, capacity and demand in accordance with its approved IPSP. The OPA’s IPSP and procurement processes must both be submitted to the Ontario Energy Board (Board) for review and approval.
On August 29, 2007 the Board received from the OPA applications for review and approval of the IPSP and for the electricity procurement processes of the OPA.
On October 2, 2008, the IPSP hearing was adjourned until further notice.
QUICK LINKS
- Application
- Registered Intervenors
- Notices
- Procedural Orders
- Phase 1 Issues Proceeding
- Interrogatories:
- Motions:
- Intervenor Evidence:
- OPA Witness Panels
- OPA Proposal Regarding Supplemental Directive (filed September 26, 2008)
- Transcripts
- Cost Eligibility and Cost Awards:
- View the Regulatory Activities Calendar for upcoming times/locations
UPDATE
|
Date |
Issue / Document |
|---|---|
|
|
|
|
Dec 11-08 |
The Board issued Procedural Order No. 10 in the IPSP proceeding: |
|
Oct 3-08 |
OEB Adjourns Review of the Ontario Power Authority’s Integrated Power System Plan and Procurement Processes On October 2nd, the Ontario Energy Board announced the adjournment of the current Integrated Power System Plan (IPSP) hearing, accepting the OPA's request that it not continue hearing witnesses until the re-filing occurs. The Board found it would be premature to continue with hearings until such time as the OPA re-files the revised IPSP based on the supplementary directive issued by the Ministry of Energy and Infrastructure on September 17, 2008. The proposed date for the OPA to re-file a revised IPSP plan is March 16, 2009. As an interim step, the Board has requested a written update be submitted to all parties on November 30, 2008, on the status of the plan updates and the proposed timeline to resubmit. The Board’s oral decision begins on page 205 of the transcript of the October 2, 2008 hearing. |
|
Sep 23-08 |
The Board issued Procedural Order No. 9 in the IPSP proceeding: |
|
IPSP Hearing commences on Monday, September 8th at 9:30 AM. If you would like to listen to the proceeding, click here for an audio connection. The agenda for the day is a presentation by the Ontario Power Authority (IPSP – Outline of Evidence). The presentation materials can be downloaded in advance of the hearing here. Please note that on Tuesday, September 9th and every hearing day thereafter, the hearing will commence at 9:00 AM. |
|
|
Sep 4-08 |
The Board issued Procedural Order No. 8 in the IPSP proceeding: |
|
Jul 30-08 |
The Board issued Procedural Order No. 7 in the IPSP proceeding: |
|
Jun 25-08 |
The Board issued a Decision and Order on Motion and Procedural Order No. 6 in the IPSP proceeding: |
|
Jun 17-08 |
The Board issued Procedural Order No. 5 in the IPSP proceeding: |
|
May 23-08 |
The Board issued Procedural Order No. 4 in the IPSP proceeding: |
|
May 8-08 |
The Board issued a Decision and Order on Cost Awards in the Phase 1 of the IPSP proceeding: |
|
Apr 8-08 |
The Board issued Procedural Order No. 3 in the IPSP proceeding: |
|
Mar 26-08 |
The Ontario Energy Board has issued a Decision today approving an issues list for its review of the Ontario Power Authority’s (OPA) Integrated Power System Plan (IPSP) and procurement processes, concluding phase 1 of the proceeding. In phase 2, to be scheduled for mid-2008, the Board will use the issues list as the basis for its review of the OPA’s application. |
|
Jan 28-08 |
The Board issued Procedural Order No. 2 in the IPSP proceeding: |
|
Jan 9-08 |
Further to the discussion at Procedure Day on January 8, 2007, the OPA has revised its proposed issues list. |
|
Dec 14-07 |
Today the Board issued a decision on cost eligibility and direction to parties. |
|
The Board issued Procedural Order No. 1 in the IPSP proceeding: |
|
|
The Ontario Energy Board is seeking comment on the issues which are proposed to be heard in the review of the Ontario Power Authority’s (OPA) Integrated Power System Plan (IPSP). The IPSP notice published by the OPA today at the Board’s direction also includes information about how the public will be able to participate in the first of two phases in the Board’s review of the OPA’s application.
To comment on the OPA draft issues list, click here. |
|
|
Aug 29-07 |
The Board has received from the Ontario Power Authority (OPA) applications for review and approval of the Integrated Power System Plan (IPSP) and for the electricity procurement processes of the OPA. |
CONTACT